...

ADVERTISMENT

Work progresses on Aro internal roads

Work is progressing on three Aro internal roads attracted by Mazi Obasi Lawson( Sobaz) from the Niger Delta Development Commission (NDDC).

The roads are Atani phase 2 road, Atani-Amuvi road and Atani-Amukwa-Ugbo, Amankwu road. Our  correspondent who visited the sites reported that construction work was steadily progressing on all the roads. At Atani phase 2, a new bridge has been constructed  to ease the flow of water from Iyi agwo which in the past, experiences flooding around that area. Also work has been completed on the drainages  leading into Atani 2 towards Atani boundary with Akwa Ibom State. A  swamp excavator, graders, pay loaders  and bulldozers were seen carrying out various construction work on the site. 

At the Atani-Amuvi road axis, construction of drainage has been concluded while grading and stone basing  was ongoing as at the time of this report.

Also evacuation work, grading and other work was ongoing at the Atani-Amukwa-Ugbo axis. Our correspondent also reported construction activities on Ndi Okoro compound road in Atani.

Aro News

Leave a Reply

Your email address will not be published. Required fields are marked *

Featured Posts

Featured Posts

Stay in the loop

Subscribe to the newsletter for all the latest updates


DONATION INFORMATION

Access Bank
1699857061

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.